问题描述:
[单选]
IE什么阶段开始申请模具参数?At which gate ,IE should apply the die parameter?a.CDb.CAc.SBAd.FA
A.A
B.B
C.C
D.D
参考答案:查看无
答案解析:无
☆收藏
答案解析:无
☆收藏
上一篇:PM weekly report中,每个项目的PDP Gate时间是开始时间还是结束时间a. 开始b. 结束
下一篇:"Standard design capacity is 1000pcs/wk (120hrs/wk), if customer"s volume is 1190pcs/wk, which one is correct?现有的标准设计产能是1000pcs/wk,如果客户需求增加至1190pcs/wk,以下说法正确的是"a. If the period is longer than 1 months, need new standard capacity.如果客户新需求持续超过1个月,则需要重新制定产能"b. If the period is less than or equal to 1 months, need new standard capacity.如果客户新需求持续不足或等于1个月,则需要重新制定产能"c. If the period is longer than 2 months, need new standard capacity.如果客户新需求持续超过2个月,则需要重新制定产能"d. If the period is less than or equal to 2 months, need new standard capacity.如果客户新需求持续不足或等于2个月,则需要重新制定产能"
- 我要回答: 网友(3.12.160.150)
- 热门题目: 1.给诗句中加括号的字注音。1. 2.如何正确选择穿刺静脉() 3.甘露醇的特点()