[多选] For a PIC=B project, which of the following description is correct? 对于PIC=B的项目,以下描述正确的是
A.DFMEA should be available by QGC1 B.DFMEA should be available by QGC2 C.PFMEA should be available by QGC2 D.PFMEA should be available by QGC3