问题描述:
[单选]
The pivot pin at the base of a sheath-screw boom davit must be().
A.inserted each time before the booms are cranked out
B.periodically removed for inspection and lubricated
C.replaced at each inspection for certification
D.in the locked position after the boat is cradled and griped dow
参考答案:查看无
答案解析:无
☆收藏
答案解析:无
☆收藏
上一篇:The ship has a diesel engine()a supercharger.
下一篇:The part of a windlass which physically engages the chain during hauling or paying out is the().
- 我要回答: 网友(216.73.216.168)
- 热门题目: 1.船上吊缸检修后,装复活塞运动 2.吊缸检修后,安装活塞运动部件 3.主机吊缸时,对大型超长冲程的
