[单选]
在一个季度末,项目发起人要求进度报告中包含一个指标,以确定项目是否将按时完成或将延迟多长时间。项目经理应该在这份报告中包含哪个指标?At the end of the quarter,a project sponsor requests that the progress report include a metric to determine if the project will be finished on time or how long it will be delay.What should the project manager include in this report?
A.成本绩效指数(CPI) Cost performance index(CPI).
B.完工偏差(VAC) Variance at completion(VAC).
C.进度偏差(SV) Schedule variance(SV).
D.完工估算(EAC) Estimate at completion(EAC).
参考答案:查看无
答案解析:无
☆收藏
答案解析:无
☆收藏
上一篇:姚老太病故后遗留下60万元遗产,遗嘱明确函( )患小儿麻痹症的小儿子王五继承20万元,遗赠隔壁对自己照顾颇多的李大嫂10万元,剩下的30万元没有明确归属。遗产分割过程中,发现姚老太尚有40万元债务未清偿,对此,以下说法正确的是( )
下一篇:重要材料需要运输供应商。如果该材料不能按时交付,项目预算将严重受到影响。为降低这个风险,项目经理购买了保险。项目经理采用了哪一种消极风险策略?Important materials require transportation suppliers. If these materials are not delivered on time, the project budget will be severely affect To reduce this risk, the project manager has subscribed insurance. Which negative risk strategy does the project manager use?
- 我要回答: 网友(18.191.30.192)
- 热门题目: 1.小李同学,周末去好又多超市买 2.我校李明同学全家月收入500 3.适应依法治国的要求,我们要树