问题描述:
[单选]
"Which item is not correct about GCSD?下面关于GCSD哪个是错误的"a. We calculate the time based on the drawing我们按照图纸来计算工时"b. Automatic cutting and crimping for cable (cross section < 6mm2)对于面积小于6平方的导线,我们按照自动切线压接来计算"c. For double crimping wires, we consider get wires 1 time and route wires 2 times.并头线 ,我们认为从架子上取1次导线,在工装板上布2次导线"d. We calculate the time based on our actual process我们算工时根据我们的实际的情况来计算"
A.A
B.B
C.C
D.D
参考答案:查看无
答案解析:无
☆收藏
答案解析:无
☆收藏
上一篇:Which item is correct about GCSD?在APTIV,GCSD是哪些单词的缩写"a.GCSD is Global Common Standard Datab.GCSD is Global Classic Standard Datac.GCSD is General Classic Standard Datad.GCSD is Global Consolidated Standard Data
下一篇:Which item is correct about GCSD? 下面关于GCSD哪个描述是正确的a. We can calculate the time by using different process, such as for cut wire we can use automatic cut by komax or manual cut + manual crimping 我们可以根据我们的实际情况来算工时 ,比如切线我们可以用Komax自动压接或手工切线+手工压接"b. The stardard time in GCSD is estimated by experience GCSD里的 时间是根据经验值定义的 "c. The standard process time is only running time of the operation 标准的过程时间仅仅是操作的运行时间"d. The standard time include preparation time.标准时间包括准备时间 "
- 我要回答: 网友(18.222.57.238)
- 热门题目: 1.当投诉人发生情绪波动时,可能 2.情绪掌控谈判术与传统的谈判术 3.投诉处理五维度分析法,主要是